About: Where do we stand with fuzzy project scheduling?   Goto Sponge  NotDistinct  Permalink

An Entity of Type : owl:Thing, within Data Space : data.idref.fr associated with source document(s)

AttributesValues
Author
Bibliographic Citation
  • Bonnal P, Gourc Didier, Lacoste Germain. Where do we stand with fuzzy project scheduling?. Journal of Construction Engineering and Management, American Society of Civil Engineers, 2004, 130 (1), pp.114-123. ⟨10.1061/(ASCE)0733-9364(2004)130:1(114)⟩
Title
  • Where do we stand with fuzzy project scheduling?
dc:date
  • 2004
Faceted Search & Find service v1.13.91 as of Aug 16 2018


Alternative Linked Data Documents: ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data]
OpenLink Virtuoso version 07.20.3229 as of May 14 2019, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (70 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software